Calculator
Concrete calculator
Concrete for a slab, footing, round column or steps: ready-mix or bags.
Estimate onlySources reviewed 2026-11-14See the sources
What this calculator is for
This concrete calculator works out how much concrete to order as ready-mix, or how many bags to mix, for a slab, patio or path, a continuous footing, round columns or post holes, and steps. It adds the waste allowance the ready-mix trade association advises and shows every bag size side by side.
How to measure
- Measure the inside of the forms or the hole, not the finished surface around it.
- Lengths are in feet (or metres). Slab thickness, footing width and depth, column diameter, and step rise and run are in inches (or centimetres).
- Steps: count the steps, measure their width, the height of one step (rise) and the depth of one tread (run). Steps are worked out as solid blocks from the ground up.
The formula
- Slab = length × width × thickness. Footing = length × width × depth. Round column = π × diameter² ÷ 4 × height × number of columns.
- Steps = width × run × rise × n(n+1) ÷ 2, where n is the number of steps (each step is a block from the ground up), plus width × landing depth × n × rise for a top landing.
- Volume to order = volume × (1 + waste ÷ 100) (S4). Cubic yards = cubic feet ÷ 27 (S8).
- Bags = volume ÷ yield per bag, rounded up (S3).
Worked example
The example "Ramp landing, 5 ft by 3 ft" in the start panel: a slab 5 × 3 ft, 4 in thick, with 4 % extra (S4). The sizes have sources (shown with the example).
- Thickness 4 in ÷ 12 = 0.333 ft. Volume = 5 × 3 × 0.333 = 5 cu ft.
- With 4 % extra: 5 × 1.04 = 5.2 cu ft = 0.19 cu yd (÷ 27).
- Bags: 5.2 cu ft ÷ the yield per bag, rounded up: the fewest is 8 bags of 90 lb (S3); the result lists the other sizes.
- Enter a ready-mix or bag price under More options to see the costs.
Questions
- How much extra should I order?
- The ready-mix trade association advises 4 to 10 % over plan dimensions (S4). The calculator starts at 4; raise it under More options.
- Why does it show five bag sizes?
- Bags come in 40 to 90 lb sizes with different yields (S3). The result shows the size that needs the fewest bags; the others are under "Other bag sizes".
- Ready-mix or bags?
- Type a ready-mix price and a bag price under More options and the result names the cheaper total with your prices. It gives no other rule, because our sources give none.
- How are steps worked out?
- Each step is a solid block from the ground up, so the bottom step is one rise high and the top step n rises high. A top landing adds width × landing depth × full height.
- Does it work for post holes?
- Yes: choose Column, enter the hole diameter, its depth and how many holes.
Reference: yield of bagged concrete mix
Scroll the table sideways for more →
| Bag | Yield, cu ft | Yield, L | Bags per cu yd |
|---|---|---|---|
| 40 lb (18.1 kg) | 0.3 | 8.5 | 90 |
| 50 lb (22.6 kg) | 0.375 | 10.6 | 72 |
| 60 lb (27.2 kg) | 0.45 | 12.7 | 60 |
| 80 lb (36.2 kg) | 0.6 | 17 | 45 |
| 90 lb (40.8 kg) | 0.675 | 19.1 | 40 |
Waste allowance: 4 to 10 % over plan dimensions (S4).
Sources
- S3: Manufacturer technical data sheet for a packaged concrete mix meeting ASTM C387, revised October 2022: yield per bag for 40, 50, 60, 80 and 90 lb bags. Full reference in the site's source list (SOURCES.md).
- S4: National Ready Mixed Concrete Association, Concrete in Practice 8, "Discrepancies in Yield" (2016 edition): "an allowance of 4 to 10 percent over plan dimensions for waste, over-excavation and other contingencies".
- S8: National Institute of Standards and Technology, Guide to the SI (SP 811), Appendix B.8: 1 ft = 0.3048 m, 1 in = 2.54 cm, 1 lb = 0.45359237 kg, 1 US gal = 3.785411784 L, 1 short ton = 2,000 lb.
Every figure on this page comes from these sources. Where a source gives a range, the calculator shows the range and lets you change the value.